
OUR COMMITMENT
Our dock systems are designed to eliminate dock issues for the next generations of rowers.
- Safety
Our dock systems are engineered and designed with safety as the first and foremost priority.
- Customer Service
Having a dockout-of-commission due to repairs or improper mooring can cost a facility a great deal of time and money. We are committed to providing unparalleled service and support to our customers.
What Makes a RowAmerica Lifetime Dock System?
Our dock systems are designed to eliminate dock issues for the next generations of rowers. We explore common rowing dock problems, and how our design provides long-term solutions.
- Wood Decking Requires Upkeep
the problem
rowamerica solution
- Lack of Long-Term Durability
the problem
rowamerica solution
Our frames are built with marine-grade aluminum (6061-T6) and consist of a 2 inch by 6 inch rectangle tube, with 1⁄4 inch thick aluminum (twice the thickness of most rowing docks).
Our heavy-duty box frame vs. typical C channel frame can be seen to the right.
This is the strongest dock frame in the industry, but there is more to its strength than just its size and thickness.
The corner construction is vitally important. Our dock frame welded sructural angles on each corner. This greatly increases the frame’s strength. An example of the heavy-duty gusset can be seen to the right.
- Improper Height and Poor Stability
the problem
rowamerica solution
Our proprietary floats ensure the proper freeboard height for rowing (5-6 inches) AND allow us to have floatation under every inch of our docks.
Eight 200 pound rowers holding a 200 pound boat plus the weight
of a cox and coach will not cause our docks to go below
the water line. There are no other docks in the industry that exceed the strength and buoyancy of our docks.
- Ineffective Bumpers
the problem
rowamerica solution
- Wavy, Loose Decking, Poor Debris Drainage
the problem
If a dock doesn’t have a grids separating its decking from its floats then over time decking becomes loose, warped or wavy, and creates tripping hazards. Additionally, debris builds up and will not clear even with heavy rain or a hose.s
rowamerica solution
We’ve created an aluminum grid that provides a structure for attaching floats on the bottom and boards on the top, placing a space of 1 inch between them. (Aluminum grid shown in green in diagram and pictured below.) This allows for easy drainage and cleaning.
Configuration and Installation
Our dock systems can include any combination of our docks, piers, ramps, and gangways.
- The dock sections are modular and can be configured to the width and length that is optimal for your site.
- Installations are often completed by our team. However, we can provide instructions and guidance for any crew that would prefer to complete their own installation.
- Mooring is critical to the long-term viability of a dock system. We provide engineers to determine the optimal plan for your location if you have not done so already.






















